§ 63-4. Residential development fees.  


Latest version.
  • A. 
    Imposed fees.
    (1) 
    Within the residential zoning districts, residential developers, except for developers of the types of development specifically exempted below, shall pay a fee of 1.5% of the equalized assessed value for residential development, provided no increased density is permitted.
    (2) 
    When an increase in residential density pursuant to N.J.S.A. 40:55D-70d(5) (known as a "d" variance) has been permitted, developers may be required to pay a development fee of 6% of the equalized assessed value for each additional unit that may be realized. However, if the zoning on a site has changed during the two year period preceding the filing of such a variance application, the base density for the purposes of calculating the bonus development fee shall be the highest density permitted by right during the two-year period preceding the filing of the variance application. Example: If an approval allows four units to be constructed on a site that was zoned for two units, the fees could equal 1% of the equalized assessed value on the first two units; and the specified higher percentage up to 6% of the equalized assessed value for the two additional units, provided zoning on the site has not changed during the two-year period preceding the filing of such a variance application.
    B. 
    Eligible exactions, ineligible exactions and exemptions for residential development.
    (1) 
    Affordable housing developments and developments where the developer has made a payment in lieu of on-site construction of affordable units shall be exempt from development fees.
    (2) 
    Developments that have received preliminary or final site plan approval prior to the adoption of a municipal development fee ordinance shall be exempt from development fees, unless the developer seeks a substantial change in the approval. Where a site plan approval does not apply, a zoning and/or building permit shall be synonymous with preliminary or final site plan approval for this purpose. The fee percentage shall be vested on the date that the building permit is issued.
    (3) 
    Development fees shall be imposed and collected when an existing structure undergoes a change to a more intense use, is demolished and replaced, or is expanded, if the expansion is not otherwise exempt from the development fee requirement. The development fee shall be calculated on the increase in the equalized assessed value of the improved structure.
    (4) 
    Residential structures demolished and replaced as a result of a natural disaster and green buildings shall be exempt from paying a development fee.